“Elektroprivreda BiH is planning to invest 83 million EUR ($99.6 million) in the process of construction of its first wind farm on the plateau Podvelezje above Mostar. Wind Farm Podvelezje represents the first investment of Elektroprivreda BiH, and the annual production is estimated at 120 GWh.

Based on the Decision of the Government of the FBiH, PE Elektroprivreda BiH started activities on the preparation and construction of the Wind Farm Podvelezje on the micro-locations of Mali Grad and Svetigora at about 760 meters above the sea level. Elektroprivreda BiH obtained a concession at this location for the period of 30 years for the use of wind energy from the Herzegovina-Neretva Canton.” (Sarajevo Times)